Level Separation 132 | NTA

Grade separation is designed to maintain passenger safety by separating them and their vehicles from heavy rail operations with a bridge passing over the railway track.

alt
Project Scope:
NIS 116,751,786
alt
Execution Period:
2015 – 2020
alt
Project Manager:
Alex Goldman
alt
Client:
Ayalon Highways
alt
alt
alt
alt
Scope of work:
250 m long bridge
An approx. 40 m wide dual-carriageway roadway on each side.
Temporary and final traffic arrangements
Landscaping, safety railings, marking and painting works
Description of services:
-Design management
-Expediting of land availability
-Coordination work with public authorities and utility bodies
-Contractor construction management, supervision and control
-Timetable and budget management
-Progress payment and final payment control
-Completion of the project and opening for public use