Complexity of the project:
Two huge approx. 6.5 m high, 60 m long and 560 ton steel buildings were lifted in this project. [Each] building was equivalent in length to two railcars, weighing approx. 3 railcars and with a height equivalent to a double-decker railcar. The steel structures will be used as a base for the southern terminal hall floor. This is one of the most complex engineering undertakings ever executed in Israel and by Israel Railways in particular.
Description of services:
Construction management and supervision of the project through handover and opening for public use.