    Hashalom Railway Station Upgrade

    Two huge approx. 6.5 m high, 60 m long and 560 ton steel buildings were lifted in this project. [Each] building was equivalent in length to two railcars, weighing approx. 3 railcars and with a height equivalent to a double-decker railcar. The steel structures will be used as a base for the floor of the hall of the southern terminal. This is one of the most complex engineering undertakings ever executed in Israel and by Israel Railways in particular.

    alt
    Value of construction:
    NIS 55 million
    alt
    Construction period:
    2016-2020
    alt
    Project Manager:
    Yosi Bracha
    alt
    Client:
    Israel Railways
    alt
    alt
    Complexity of the project:
    Two huge approx. 6.5 m high, 60 m long and 560 ton steel buildings were lifted in this project. [Each] building was equivalent in length to two railcars, weighing approx. 3 railcars and with a height equivalent to a double-decker railcar. The steel structures will be used as a base for the floor of the hall of the southern terminal. This is one of the most complex engineering undertakings ever executed in Israel and by Israel Railways in particular.
    Description of services:
    Construction management and supervision of the project through handover and opening for public use.