alt

Grade Separation no.132

Grade separation designed to maintain passenger safety by separating them and their vehicles from heavy rail operations with a bridge passing over the railway track.

alt
Value of construction:
NIS 116,751,786
alt
Construction period:
2020 – 2015
alt
Project Manager:
Alex Goldman
alt
Client:
Ayalon Highways
alt
alt
alt
alt
Scope of work:
- 250 m long bridge
An approx. 40 m wide dual-carriageway roadway on each side.
- Temporary and final traffic arrangements
- Landscaping, safety railings, marking and painting works
Description of services:
- Design management
- Expediting of land availability
- Coordination work with public authorities and utility bodies
- Contractor construction management, supervision and control
- Timetable and budget management
- Progress payment and final payment control
- Completion of the project and opening for public use